THE SYSTEM
Management starts with verified context.
Mikhailych is designed as one operating system for construction company management. It connects contracts, projects, people, deadlines, tasks, documents, and management decisions while preserving the source of each material conclusion. Intelligent agents are parts of the system, not a standalone collection of chatbots. This site shows the intended logic; a connection to the operational core is a separate project.
01 / MODEL
One product
Five levels present different jobs on a shared core.
Human authority
Material decisions and corporate mandates belong to authorized people.
Traceability
A report, fact, risk, and result have distinct statuses.
02 / BOUNDARY
What Mikhailych does, and what only a person does
This is how the system is designed. The working core is not connected yet.
Mikhailych
- Relates a report to the contract, schedule, and project.
- Shows the source and status of every piece of information.
- Separates what is verified from what is not.
- Prepares a question for decision: who may decide and on what basis.
- Keeps the record: what happened and who confirmed what.
Only a person
- Confirms a fact when evidence is needed.
- Makes a significant decision and answers for it.
- Accepts and signs off work and documents.
- Grants and withdraws authority in the company.
- Gives a legal opinion.
03 / STATUSES
Five statuses that are never mixed
Every piece of information in the system has one status. A report does not become a fact on its own, and a risk does not become a decision.
- 01Report
- Someone reported an event. The source is known; the content is not verified.
- 02Fact
- Confirmed by evidence: a document, a photo, or a record.
- 03Risk
- A possible consequence. It is an assessment, not an established fact.
- 04Decision
- A choice made by an authorized person. Who decided and on what basis is recorded.
- 05Result with evidence
- The outcome of an action, confirmed by a document or a record. Without evidence it does not count as a result.
04 / FROM DATA TO ACTION
A signal is not a fact. A risk is not a decision.
A foreman reports a possible delivery delay. The system can relate the report to an obligation and schedule, but verification comes first. Until then, the director sees a matter under watch, not a confirmed missed deadline.
Follow the event chain